PROJECTS

Turbo core and York air cool chiller equipment inspections

In the project involving the replacement of coils in the York air-cooled chiller, the team identified a decrease in system efficiency and compromised cooling capacity due to the obsolescence of the existing coils. This situation demanded an immediate intervention to restore the optimal functionality of the chiller and ensure efficient long-term performance.

The solution entailed detailed planning for the replacement of the affected coils. The installation proceeded with state-of-the-art coils, specifically designed to enhance energy efficiency and the chiller's cooling capacity. During execution, a precise disconnection of compressors and the expansion valve took place, facilitating the meticulous removal of obsolete coils. The integration of the new coils was approached technically, considering the precise calibration of temperature and pressure sensors to optimize system control. Additionally, enhancements were made to the filtration system, and adjustments were applied to the management system parameters, ensuring efficient and prolonged chiller performance.

Service on a four season system

In servicing a four-season system, the seasoned professional ensured optimal functionality across various weather conditions. Meticulously identifying potential issues in HVAC components, comprehensive inspections were conducted for seamless seasonal transitions. This involved examining heat exchangers, inspecting ducts, and calibrating controls for efficient climate management. Maintenance measures were implemented, addressing wear in components like compressors and fans, ensuring reliability throughout all four seasons.

The solution focused on a strategic approach for each season. In winter, the professional verified heating elements and insulation for warmth. Spring and fall involved fine-tuning ventilation for optimal airflow and air filter checks. Summer emphasized efficient air conditioning with thorough cleaning and calibration. Adhering to industry standards and safety protocols, the professional provided a comprehensive service, maximizing system efficiency and longevity across all seasonal demands.

Murrieta shopping center

In the installation project at Huntington Beach Plaza, a skilled professional led the deployment of 2, 3, and 5-ton HVAC units. Precision and expertise were key in seamlessly integrating these units, ensuring efficient climate control. Assessments and load calculations guided optimal unit placement, adhering to industry standards for meticulous connections. The result was a comprehensive HVAC system tailored to Huntington Beach Plaza's specific needs.

The installation process, overseen by the experienced professional, involved careful placement and sizing of HVAC units. Meticulous connection of ductwork, electrical components, and refrigerant lines adhered to industry standards, creating an effective and balanced climate control system for Huntington Beach Plaza.